«Public Disclosure Authorized PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Report No.: 97671 Ghana Sankofa Gas Project Project Name Africa ...»

-- [ Page 1 ] --

Public Disclosure Authorized

PROJECT INFORMATION DOCUMENT (PID)

APPRAISAL STAGE

Report No.: 97671

Ghana Sankofa Gas Project

Project Name

Africa

Region

Oil, Gas and Mining

Sector

P152670

Project ID

Public Disclosure Authorized

Republic of Ghana

Borrower(s)

Sankofa Gas Field International JV Implementing Agency [X] A [ ] B [ ] C [ ] FI [ ] TBD Environment Category May 20, 2015 Date PID Prepared May 29, 2015 Date of Appraisal Authorization July 30, 2015 Date of Board Approval I. Country Context Public Disclosure Authorized Ghana, with a population of about 25 million and GDP per capita of US$1,730, has experienced strong and broadly inclusive growth over the past two decades. There have been significant improvements in poverty and social indicators and the country is transitioning to lower middle-income status. The economy has outperformed most of the developing Sub-Saharan countries by a large margin.

Nevertheless, about a quarter of the population lives below the poverty line, over 8 percent in extreme poverty, and six to seven million jobs will need to be created in the next two decades to absorb new entrants into the labor market. Success in addressing these challenges will critically depend on complementing extractive industries with diversified private sector-led growth in labor intensive industries.

Oil and gas developments significantly complement the country’s efforts to move to middle income status. Ghana’s economy is expected to maintain robust growth over the medium term, bolstered by improved oil and gas production, increased private-sector investment, improved public infrastructure development, and sustained political stability. Oil reserves are estimated at around two billion barrels, and Public Disclosure Authorized

–  –  –

The energy sector is inextricably linked to Ghana’s macroeconomic performance through multiple channels, namely through the real sector, the fiscal accounts, and the balance of payments. Recent studies estimate the fiscal shock of the gas and power shortages and oil and gold price declines at a minimum of 2 percentage points of GDP and it is expected to have a protracted impact. By having a more stable local gas supply, these kind of shocks will be mitigated. With the development of Sankofa, output growth will be less volatile, and hence the likelihood of debt sustainability will be enhanced.

The Sankofa oil field1 is expected to produce oil in the order of 30,000-45,000 b/d on average per day in the 2017-2022 period, equivalent to approximately US$5 billion at current World Bank Group oil price projections. Hence, the impact of Sankofa development on the balance of payments is critical in reducing the pressure on the currency, which in turn, will enhance debt sustainability given the composition of public debt.

The Sankofa Gas Project will complement the World Bank and IMF’s macroeconomic and fiscal support programs by supporting the GoG strategy2 to leverage new domestic gas and oil resources to develop the manufacturing sector and higher value agriculture. This strategy will require significant investments in infrastructure and removal of the main bottlenecks to economic growth, including inadequate and unreliable electricity supply and lack of affordable bank financing for the private sector. The Sankofa Project will help unlock such infrastructure investments by catalyzing foreign direct investment in the country and setting a significant precedent in the international investment markets.

II. Sector and Institutional Context

The energy sector in Ghana includes the petroleum and electricity sub-sectors and, given the high dependency of electricity sub-sector, they are strongly interlinked. The commercialization of Ghana’s natural gas resources is driven by the power sector’s need for fuel. The current volumes of proven reserves in Ghana’s domestic gas fields are sufficient for domestic use of gas for the foreseeable future.

The power sector critically depends on additional gas resources becoming available as an alternative and relatively less expensive fuel source to improve electricity services and reestablish the sector’s financial equilibrium. At the same time, monetization of Ghana’s domestic gas resources depends on the ability of the electricity sector to consume and pay for the gas.

Given the supply risks from Nigeria, development and maximization of domestic gas resource use is crucial to the security of fuel supply to the Ghanaian power sector. The West African Gas Pipeline (WAGP) has experienced severe supply shortages in Nigeria and frequent interruptions in deliveries.

Prospects for attaining the contractual level of supply remain uncertain and depend upon domestic Nigerian gas/supply demand pressures that take priority over exports through WAGP. Domestic gas in Ghana has been slow to arrive. Although Jubilee oil production began in December 2010, the pipeline and processing plant needed to process and transport associated gas did not enter into service until the end of

2014. Therefore, over the last several years, unavailability of firm capacity of gas on a long-term basis from Nigeria and from domestic gas fields have led to an additional cost of US$30 million per month of light crude oil (LCO) to avoid major load shedding.





Ghana’s 2011 Petroleum Revenue Management Act (PRMA) provides a solid system for collection, allocation and management of petroleum revenues. Under the PRMA, all royalties, taxes, and participating interests are to be deposited into a consolidated account. From the consolidated account, GNPC receives a priority distribution equal to its equity finance costs plus a portion of the revenue from carried and participating interests (CAPI).3 The remaining oil revenue is distributed between the currentyear budget (limited to 70 percent of revenue), the Ghana Stabilization Fund, and the Ghana Heritage Fund. The PRMA establishes governance, oversight, and disclosure requirements and defines the eligible categories of investment for petroleum revenues. It prohibits using oil revenues as collateral for debts and The proposed Sankofa Gas Project is a part of the integrated development of the Offshore Cape Three Points Gas and Oil fields.

Ghana Shared Growth and Development Agenda II (2014-17) The current level of CAPI contributions to GNPC is set by the GoG at 30 percent of the net cash flow from the carried and participating interests after deducting the equity financing cost of GNPC.

guarantees. The PRMA is designed to ensure that the oil and gas revenues that accrue to Ghana are primarily used for protecting the future of Ghana’s public and the macroeconomic health over the medium term.

Ghana’s Electricity Sector

Access to electricity in Ghana, at about 75 percent, is well above other countries in sub-Saharan Africa.

Electricity consumption per capita was 344 kilowatt hours (kWh) per capita in 2011. Ghana was one of the first countries in sub-Saharan Africa to unbundle its power sector into separate generation, transmission, and distribution utilities. Ghana was also one of the first countries in sub-Saharan Africa to attract private investment through independent power projects (IPPs). Ghana’s high-voltage power grid is interconnected with neighboring countries (Cote d’Ivoire, Togo, Benin and, in the near future, Burkina Faso). Already an electricity exporter, Ghana is well positioned to further develop its role as electricity exporter and energy ‘bank’ in the sub-region. While fuel shortages and macroeconomic shocks have impacted the sector in the past few years, the Ghanaian power sector remains one of the most advanced in Africa.

Traditionally, hydropower has been the main source of energy, but it is increasingly being complemented by thermal generation. Ghana has an installed power generation capacity of over 2,800 MW, made up of 1,600 MW of hydropower plants, 1,200 MW of gas/oil fired thermal facilities, and 2.5 MW of gridconnected solar. Approximately 800 MW of additional thermal generation capacity is currently under construction by public utilities and independent power producers. Total power generation was 13TWh in

2014. Electricity demand at peak is currently about 2,000 MW and is projected to grow by an average 5.8 percent per year in the coming decade. Ghana has been experiencing significant power outages in recent years. This is mainly due to a shortfall in generation capacity, caused by a reduction in hydropower generation due to low water levels in the main hydropower reservoir, unreliable gas supply through the WAGP system and delayed development of Ghana’s domestic gas fields.

The hydropower generation and gas fuels supply shortfalls created an increasing dependency of the generation system to run on liquid fuels, which in turn increased the cost of power generation and has required considerable government subsidies. Thermal generation has been mostly run on LCO in the past decade. Developing natural gas resources is therefore critical to reduce generation costs in Ghana. The proposed Project supports the development of the largest natural gas field in Ghana, which is also the first non-associated gas resource in country to be exploited. The activities under the Project would produce up to 180 mmcfd from mid-2018 for almost 15 years. As Sankofa gas is non-associated, it will be able to provide base-load gas supply to power up to 1,000MW of generation capacity.

The Sankofa Project is designed to substitute expensive, imported alternate liquid fuels used by the power sector of Ghana with domestic, abundant and reasonably priced natural gas. The Project will also enable new thermal power generation capacity to be constructed. Gas production at other fields currently in operation in Ghana will decline rapidly after 2020. The Sankofa gas field is expected to be in production for almost two decades thereafter. The Project will therefore help address Ghana’s current financial challenges in the downstream power sector.

GoG is taking a number of parallel actions in order to start a virtuous cycle of increasing revenues and reducing costs in the electricity sector. The 2013 tariff increase already has a visible effect on the financial equilibrium of the sector. Short term efficiency measures in ECG supported by IDA and medium term reforms to the management of the distribution sub-sector as part of the Millennium Challenge Corporation (MCC) Compact II, will help to improve billing, revenue collection, operational efficiency and attract private financing. A PURC-led cash management system for the sector is at an advanced stage of preparation. This will bring greater predictability to the flow of funds in the power sector.

III. Project Development Objective(s) The Project’s Development Objective (PDO) is to increase the availability of natural gas for clean power generation by leveraging private capital investment.

IV. Project Description World Bank Guarantees, along with IFC lending and MIGA political risk insurance, are expected to support the development of the largest foreign direct investment opportunity in Sub-Saharan Africa in recent times. World Bank Group support will underpin US$8 billion of foreign private investment in the economy. The Project will be structured in a manner that reduces Ghana’s fiscal support at a time when macroeconomic uncertainty is affecting the investment climate. The World Bank Group is expected to support the Government of Ghana (GoG) and private parties to ensure timely completion of the Project.

The technical development of the different fields (oil and gas) with regard to their expected commercial operation dates is slightly sequenced and for this reason the joint development of both OCTP components is referred to as Phase 1 (oil) and Phase 2 (natural gas). The proposed IDA support will only apply to the Phase 2 (gas) development and related commercial agreements. The oil field development under Phase 1 will not benefit from IDA support.

Eni is to be the operator of the entire block, holding a 44.4 percent participating interest, with Vitol holding 35.6 percent, and the Ghana National Petroleum Corporation (GNPC) the remaining 20 percent.

The project will use a shared floating production storage and offloading unit (FPSO), which can process both oil and natural gas. The non-associated gas development will consist of five wells linked to the FPSO. A subsea pipeline will carry the gas from the FPSO to an onshore receiving facility at Sanzule.

From there, a connection will be made to an existing pipeline that connects another field, Jubilee, with thermal generation plants at Aboadze, near Takoradi in Western Ghana.

The total capital cost of the Phase 1 and 2 developments over the project lifetime is US$7.9 billion (including exploration costs). The private sponsors envisage financing their share of the project costs during construction through a mix of equity, shareholder loans, and commercial debt. GNPC’s 15 percent share of construction costs is carried by Eni and Vitol at no cost during construction while its additional 5 percent share will also be carried and repaid with the proceeds from oil lifting. GNPC will be the offtaker of the Sankofa gas and resell it to the downstream power sector.

The security package agreed by all parties includes a comprehensive set of risk mitigation structures, but limited government support aimed at enhancing the creditworthiness of GNPC as offtaker of the gas for the duration of the GSA. The World Bank has worked with GoG, GNPC, and the private sponsors to make sure that principles of efficiency and effectiveness have been applied in the design and use of IDA Guarantees. The amount requested by the GoG to be used for both Payment and Debt Guarantees amounts to a total of US$700 million. This World Bank Guarantee support will leverage substantially larger gas payment flows over the terms of the contract and facilitate an investment in the Sankofa project of up to US$7.9 billion by the private sector.



Pages:   || 2 |


Similar works:

«IJRRAS 7 (1) ● April 2011 www.arpapress.com/Volumes/Vol7Issue1/IJRRAS_7_1_03.pdf MOSAICING OF TORN DOCUMENT IMAGES Nagaraj B. Patil1, V. M Viswanatha2 & Sanjay Pande M. B3 Dept. of Computer Science and Engg., Government Engg. College Raichur Karnataka, India Dept. of Electronics and Communication And Engg., Sln College of Engg. Raichur, India Dept. of Computer Science & Engg., Gsssiet for Women, Mysore, India and 2 are research scholars of Singhania University, Rajastan, India Email:...»

«! Sausalito Presbyterian June Church !Directions!&!Parking!!!!!!!Leadership!!!!!!!!Our!Website!!!!!!! !facebook.com/SausalitoPresbyterianChurch! Sunday'School'has'recessed'for'the'summer.'' Nursery'childcare'will'resume'on'Sunday,'August'21.SPC ANNUAL CONGREGATIONAL MEETING IS THIS SUNDAY, IMMEDIATELY AFTER THE SERVICE Vote!twice!this!year!!!Once!on!Sunday!99!and!then!again!on!Tuesday! The!session!has!scheduled!the!Annual!Congregational!Meeting!for!Sunday,!June!5th,...»

«Corporate Governance statement Unibet Group plc is the Parent Company of the Unibet Group, incorporated and registered in Malta and listed on NASDAQ OMX Stockholm through Swedish Depositary Receipts, SDRs, issued by Skandinaviska Enskilda Banken AB (publ). Foreign companies whose shares or depositary receipts are admitted to trading on a regulated market in Sweden are required to apply either the Swedish Code, or the corporate governance code in force in the country where the company has its...»

«CITY OF LOS ANGELES BOARD OF FIRE FIRE DEPARTMENT COMMISSIONERS CALIFORNIA RALPH M.TERRAZAS FIRE CHIEF DELIA IBARRA PRESIDENT 200 NORTH MAIN STREET ANDREW GLAZIER ROOM 1800 VICE PRESIDENT LOS ANGELES,CA 90012 STEVEN R. FAZIO (213)978-3800 JIMMY H. HARA, M.D. FAX:(213)978-3815 JIMMIE WOODS -GRAY HTTP://WWW.LAFD.ORG ERIC GARCETTI LETICIA GOMEZ MAYOR EXECUTIVE ASSISTANT II November 7, 2014 The Honorable Paul Krekorian Chair, Budget and Finance Committee do City Clerk, Room 395 Los Angeles, CA...»

«TomTom START Referenzhandbuch Inhalt Willkommen bei der Navigation mit TomTom 5 Das ist neu 6 Neu in dieser Veröffentlichung Los geht's 7 Im Auto befestigen Gerät positionieren Einund ausschalten Einrichten GPS-Empfang Informationen an TomTom senden Speicherkartenslot Wenn das Gerät nicht startet Gerät aufladen Passen Sie gut auf Ihr Navigationsgerät auf Elemente auf dem Display 11 Die Kartenansicht Die Routenansicht Die Routenleiste Entfernungen und die Routenleiste Das...»

«The Fine Print ISSN 1832-8871 ISSUE 4, AUGUST 2007 Editorial NEWS 4 Redact Professional Editors’ Association (NSW) Taboo, censoring and the human brain 6 Kate Burridge and Keith Allan Tabooed expressions include sexual and scatological obscenities, ethnic slurs, insults, name-calling, profanity, blasphemy, slang, jargon, vulgarities of all kinds, even the forbidden words of non-standard grammar. ‘Taking the mickey’ 20 Jessica Milner Davis Humour can be dangerous, as well as entertaining....»

«P ERFORMANCE CONDITIONING CYCLING A NEWSLETTER DEDICATED TO IMPROVING CYCLISTS www.performancecondition.com/cycling Before Bikefit Addressing Foot/Pedal Asymmetry: Part 2 Nick Dinsdale BSc (Hons), MSc, MSST, Nicola Dinsdale BSc (Hons), MSST NJD Sports Injury Clinic, Clitheroe, Lancs. UK Graduate Sports Therapists Nick and Nicola Dinsdale, father and daughter team, run NJD Sports Injury Clinic in Clitheroe, Lancs. UK. The family clinic is recognised for its strong evidencebased approach to the...»

«CONSOLIDATED ANNUAL REPORT OF MAGYAR TELEKOM TELECOMMUNICATIONS PUBLIC LIMITED COMPANY FOR THE YEAR ENDED DECEMBER 31, 2013 Consolidated Financial Statements OF MAGYAR TELEKOM TELECOMMUNICATIONS PUBLIC LIMITED COMPANY FOR THE YEAR ENDED DECEMBER 31, 2013 PREPARED IN ACCORDANCE WITH INTERNATIONAL FINANCIAL REPORTING STANDARDS (IFRS) INDEX TO THE CONSOLIDATED FINANCIAL STATEMENTS Page Independent Auditor‟s Report Consolidated Statements of financial position Consolidated Statements of profit or...»

«www.next-up.org http://www.next-up.org/pages/Justice.php Translation HC Residents living next to a phone mast vs. the mobile phone company Bouygues Telecom French Republic In the Name of the French People Versailles Court of Appeal JUDGEMENT 4 February 2009 Facts and Proceedings By the ministerial decree of 8 December 1994 the company Bouygues Telecom obtained authorisation to install in the country a radioelectric network open to the public, with a view to establishing a means of personal...»

«LIFE Project Number LIFE12 ENV/IT/000652 FINAL Report Covering the project activities from 01/10/2013 to 31/03/2016 Reporting Date 20/06/2016 LIFE+ PROJECT NAME or Acronym CLEANSED Project Data Italy – Spain Project location Project start date: 01/10/2013 Project end date: 31/03/2016 Total Project duration (in months) 30 months € 1,655,370 Total budget € 1,655,370 Total eligible budget € 827,683 EU contribution: (%) of total costs 50 % (%) of eligible costs 50 % Beneficiary Data Name...»

«1 ALL ANSWERS MUST BE GIVEN ON THE COMPUTERIZED ANSWER SHEET BY CROSSING THE CORRESPONDING LETTER Mathematics M.C.Q’s No. of Questions: 50 (from 1 to 50) Time: 80 Minutes Questions on Page Numbers: 1 To 8 Negative markings: Yes Q1 In the xy coordinate plane, line L contains the points (0, 0) and ( 1, 3). If line M is perpendicular to L and passes through the origin, then the equation of line M is A) y = 3x B) x = 3y C) x+y=3 x = – 3y D) Q2 If 0 satisfying =, then the value of w will be A)...»

«Poverty, debt and credit: An expert-led review Final report to the Joseph Rowntree Foundation Yvette Hartfree and Sharon Collard March 2014 Contents Contents 1 Introduction 1.1 Research aims 1.2 Defining poverty 1.3 Research methods and scope 1.4 Report structure 2 The relationship between debt and poverty in the UK 2.1 What proportion of poor households has problem debt?.5 2.2 What are the characteristics of poor households with problem debt? 2.3 What types of problem debt do poor households...»





 
<<  HOME   |    CONTACTS
2017 www.abstract.dislib.info - Abstracts, online materials

Materials of this site are available for review, all rights belong to their respective owners.
If you do not agree with the fact that your material is placed on this site, please, email us, we will within 1-2 business days delete him.